Critical Path CSS Generator WP Registry grade A. No security issues foundWP RegistryNo security issues foundOpen the reportA
Complete page-speed toolkit: critical-path CSS inlining, stylesheet deferral, Google Fonts optimisation, script deferral/async, preload hints, and GTM lazy-loading.
Install
This is the repository archive. It installs, but the folder name will carry the branch suffix and updates will not flow.
Install straight from GitHub with WP-CLI:
wp plugin install https://github.com/donvoorhies/critical-path-css-v2/archive/refs/heads/master.zipComplete page-speed toolkit: critical CSS, stylesheet/script deferral, Google Fonts optimisation, preload hints, and lazy GTM.
Documentation
For full setup and configuration instructions, see the English user guide in this repository: https://github.com/donvoorhies/critical-path-css-v2/blob/master/USER_GUIDE.md
Description
Version 2 is a full performance toolkit targeting every major PageSpeed Insights opportunity in one plugin:
Critical CSS (FCP / LCP)
- Generate above-the-fold CSS automatically from any URL
- Inline critical CSS in
<head>as a `
Releases
3 releases.
These releases are tags only. The author does not attach a packaged zip, so there are no download counts to report.